Help Center › Change Orders
Change Orders
Add, revise, sign, and track every change order on your jobs.
Adding a Change Order to a Job
Every job starts with CO#0, which represents the original base proposal. Additional change orders (CO#1, CO#2, etc.) capture scope additions, deletions, or modifications as the project evolves.
- Select a job from the Proposals sidebar or the Jobs tab.
- Click Add CO in the toolbar.
- Fill in the CO details:
- Price — the value of this change order (can be positive or negative).
- Description — a one-line summary for the CO table.
- Scope of Work — detailed rich text description of the change.
- Qualifications — applicable terms or exclusions.
- Estimated Hours — E-ST (straight time) and E-OT (overtime) estimates for field planning.
- Estimated Materials — material cost estimate for this change.
- Click Submit. SCOPE assigns the next CO number automatically.
Tip: CO#0 always represents the original base proposal and cannot be renumbered. All subsequent change orders are numbered sequentially starting at CO#1.
Sending and Emailing a Change Order
SCOPE can deliver any CO directly to your client by email in a formatted letter layout, or you can print or download a PDF for manual delivery.
To email a CO:
- Hover over the CO row in the table to reveal the action buttons.
- Click the Email CO button (envelope icon) on the right side of the row.
- The email dialog opens with the To field auto-filled from the contact on file for that job.
- Add any additional notes in the message body.
- Click Send.
The email delivers the CO in a clean letter layout including your company logo, job details, price, scope of work, and qualifications.
Other output options:
- Print — open the CO detail view (eye icon) and click Print in the toolbar to open the browser print dialog with a formatted letterhead layout.
- PDF download — click the download icon on the CO row in the table to generate and download a PDF directly.
Note: SCOPE sends email through your configured SMTP settings. If emails are not delivering, verify your SMTP credentials under gear icon → Settings → Email Settings. See the Administration & Settings article for details.
Getting a Digital Signature on a Change Order
SCOPE includes a built-in E-SIGN workflow for collecting legally binding digital signatures on any CO. The signature is recorded with the signer's legal name, email address, dual consent acknowledgment, and a cryptographic audit trail — fully compliant with the ESIGN Act.
To sign a CO:
- Hover over the CO row in the table to reveal the action buttons.
- Click the Sign button (signature icon) on the right side of the row.
- The E-SIGN modal opens. Choose a signature method:
- Type — enter the signer's full legal name; SCOPE renders it as a styled signature.
- Signature Pad — the signer draws their handwritten signature directly on screen using a mouse or touch device.
- Fill in the signer's information:
- Signer Name — the client's or authorized party's legal name (required for the audit record in both modes).
- Signer Email — the signer's email address for the audit record.
- Check both consent checkboxes:
- Consent to use electronic records and signatures.
- Agreement to the consumer disclosure statement.
- Click Sign & Attach PDF. SCOPE generates a signed PDF of the CO and attaches it to the CO record automatically.
The signature is recorded with a timestamp, IP address, and cryptographic hash — creating a tamper-evident audit trail. The signed PDF appears in the CO's attachment panel immediately after signing.
Tip: After signing, share the attached PDF with the client as their countersigned copy. The document includes the signature metadata on the final page.
Note: The Sign button is hover-hidden and appears only when you move your cursor over the CO row. If it does not appear, confirm your user role has the sign_change_orders permission.
Tracking Billed and Received Amounts
SCOPE tracks the financial lifecycle of each CO through three key values: Price (contracted amount), Billed (amount billed to the client), and Received (collected). Keep these updated to get accurate outstanding balance reports.
- Open a job and locate the CO table.
- Click Edit in the toolbar to enter inline editing mode. All CO rows become editable.
- For each CO row, update:
- Billed — the total amount you have billed the client for this CO.
- Received — the total amount the client has actually paid.
- % Complete — field progress from 0 to 100, representing how far along the physical work is.
- Click Submit to save all changes.
Color coding in the CO table:
- Billed turns green when the billed amount is greater than or equal to the CO Price (fully billed).
- Received turns green when the received amount is greater than or equal to the billed amount (fully paid).
- Red indicates the amount is below the threshold (unbilled or underpaid).
- The % Billed and % Received columns are calculated automatically from these values.
Tip: Update Billed and Received regularly — at minimum, after each billing you send and each payment you receive. Accurate data here drives the Outstanding Balance report and the Revenue dashboard cards.
Viewing Change Order History and Revisions
When a CO needs to be updated after it has been sent or signed, use the Revise function to create a tracked revision instead of editing the original — this preserves a full audit trail.
To revise a CO:
- Click the eye (view) icon on the CO row to open the CO detail view.
- Click Revise in the toolbar.
- The edit form opens pre-filled with the current CO data.
- Make your changes to price, scope, qualifications, or any other fields.
- Click Submit. A new revision is created (e.g., CO#1 Rev 1) and the previous version is archived.
The CO table always displays the latest revision of each CO.
To view older revisions:
- Open the CO view page (eye icon).
- Use the Revision dropdown near the top of the page to select a previous revision.
- Each revision record shows the date it was created and the user who submitted it.
Tip: Always use Revise rather than editing the CO directly if the CO has already been sent to a client. This way you can show the client exactly what changed between versions.
Attaching Files to a Change Order
Attach supporting documents — drawings, photos, specs, signed PDFs — to any CO for organized, job-level document management.
- Click the paperclip icon on the CO row in the table to open the attachment panel.
- Click Add or drag and drop files onto the panel.
- Supported file types: PDF, DOC, DOCX, XLS, XLSX, JPG, PNG, SVG, WEBP, TIF, TIFF.
- Files upload immediately and are stored in Cloudflare R2.
- PDF files automatically generate a thumbnail from the first page.
Managing existing attachments:
- Edit description — double-click a file's description text to edit it inline.
- Delete — click Modify → Delete → confirm. Deleted files are soft-deleted and move to the Recycle Bin.
- Restore — go to gear icon → Administration → Recycle Bin → Attachments tab to restore a deleted file.
Note: Permanently deleting an attachment from the Recycle Bin is irreversible. Regular deletion (soft-delete) is recoverable at any time until permanently removed.
Tip: Attach the signed physical CO scan to CO#0 when clients sign by hand. This keeps your signed approval on record alongside the digital document.